Factual Investigation Report handed to NSW Police
BOC is extremely saddened by the tragic death of a newborn and the injury of
another at Bankstown-Lidcombe Hospital over the past weeks.
BOC has completed a Factual Investigation Report into the July 2015 installation
project at Bankstown-Lidcombe Hospital and this has been provided to the NSW
Police.
It was found during an inspection by Police, Hospital
staff and BOC that both the medical oxygen and medical nitrous oxide pipelines
were incorrectly labelled prior to BOC’s work being undertaken at the Hospital
in July 2015. The original installation of pipes was not conducted by BOC.
The July 2015 project documentation indicates that both a hospital
representative and a BOC contractor were involved in the commissioning of the
single oxygen outlet where the fault was found. This is the focus of ongoing NSW
Police and Coroner investigations.
Pending the outcome of these
investigations, no projects or work has been allocated to the contractor
involved in the commissioning of the oxygen outlet at Bankstown-Lidcombe
hospital.
Regardless of the outcome of any investigations, BOC
will be increasing the level of testing in every new medical gas pipeline
installation above and beyond the requirements of the Australian Standard.